Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 11309227A


Addresses:

2402 N 1ST AV


Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Permit Number - TC-COM-0423-01139

Inspection Description - ENGR Engineering Final

Inspection Status - Partial Pass

Date Description Inspector Results Comments
08/15/2024 ENGR Engineering Final Partial Pass Contractor needs to finish up the items that Josh Garcia and Steve blood requested them to do before we can pass it
08/20/2024 ENGR Engineering Final Partial Pass The sidewalk and the pedestrian pathways noncompliant. OK for a level four.
09/13/2024 ENGR Engineering Final Not Ready Stephen and I discussed this site in the office this morning about the noncompliance areas around the exterior tables. We also talked to Clayton Travillion building official advisor about the code for this site and make a determination on what we can hold to in the future if we’re not going to fully approve this site at this time. Stephen Blood and I on site and looked over the areas of concern and he will make a determination in the office after talking with the engineer record of what will be required for this site for us to approve it.
10/14/2024 ENGR Engineering Final Passed The Roof Drainage for the outside dining area has been evaluated by Stephen Blood and a determination has been made by him that since the Comments for the Plan Approvals did not address this issue when it was Approved then we would not be addressing this at this time.
This issue has been Approved at this time but any remodeling or future work on this site will require full Code Compliance for the change to be made at that time.