Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2024 | ENGR Engineering Final | Passed | ||
| 12/14/2023 | ENGR Engineering Final | Partial Pass | TC of O level 4 will review parking lot with Dave Robert’s. Roll off dumpster to be removed today from front of building. |