Inspection Status: Partial Pass
Inspection History: COT - HCBU - Masonry Pregrout
Permit Number - TC-COM-0423-01064
Inspection Description - COT - HCBU - Masonry Pregrout
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/04/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
COT - HCBU - Masonry Pregrout | Partial Pass | 1/9/24: g21 to b9 and 10.1 to 2.9 okay to place concrete top out masonary wall. | ||
04/16/2024 | COT - HCBU - Masonry Pregrout | Not Ready | 4/16/24: not ready | |
05/08/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 5/8/24: Okay to grout first 4' lift of decorative columns at all front entrances, garden center entrances, and loading dock wall. | |
05/14/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 5/14/24: garden center okay to grout second lift. main entrance okay to grout 3rd lift at wall close to building pillars okay to grout 2nd lift. and lumber yard okay to grout 3rd. | |
05/15/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 5/15/24: main entry okay to grout and continue to 5th lift. Lumber yard okay to grout and move to 4th lift. | |
05/17/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 5/17/24: Main entry okay to grout 5th lift, lumber yard okay to grout 4th lift, garden center okay to grout 3rd lift, and okay to grout top of loading dock wall. | |
05/21/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 5/21/24: garden center columns okay to grout and cap. Main entrance four piers from 8' to 12' okay to grout and cap. Main entrance wall piers from 20' to 24' okay to grout. Lumber yard piers from 12' to 16'8" okay to grout. | |
05/22/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 5/22/24: lumber yard entry columns okay to grout and cap. Main entry 21' to 30' okay to grout | |
05/23/2024 | COT - HCBU - Masonry Pregrout | Passed | 5/23/24: okay to grout and cap main entry. | |
12/20/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 12/20/23: pregrout bond beam stem wall J.1/2.85 to corner 10 Corner 10/ j.1 to c Corner c to grid line 8.3 okay to pour concrete |
|
12/21/2023 | COT - HCBU - Masonry Pregrout | Not Ready | ||
12/27/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 12/27/23: 10.1 to gridline 5 bond beam pregrout stem wall okay to pour north wall Corner 10.1 to gridline 4.45 First lift okay to pour south wall 0.9 to 5 including electrical room okay to place concrete for bondbeam and steam wall first lift |
|
12/28/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 12/28/23: gridline 10.1 to 5 south wall okay to top out from 4' to 8'8" |