Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Inspection Status: Not Ready

Inspection History: COT - LCPL - Plumbing Final 

Date Description Inspector Results Comments
12/06/2024 COT - LCPL - Plumbing Final  Not Ready
12/10/2024 COT - LCPL - Plumbing Final  Re-inspection required Adjust door closers and place safety barricades as discussed
12/10/24: 2 20Amp circuits required at kitchen for small appliances, 90 degree fitting required at exterior condensate drain, properly secure mini split at platform, water heater pressure relief shall not terminate more then 6" above finish grade and less then 2X the pipe diameter, water heater enclosure not installed, hose bibs must be insane wrapped for UV Protection,
12/13/2024 COT - LCPL - Plumbing Final  Passed