Inspection Status: Not Ready

Inspection History: COT - LCBU - Building Final 

Permit Number - TC-COM-0423-01032

Inspection Description - COT - LCBU - Building Final 

Inspection Status - Not Ready

Date Description Inspector Results Comments
12/06/2024 COT - LCBU - Building Final  Not Ready
12/10/2024 COT - LCBU - Building Final  Re-inspection required Adjust door closers and place safety barricades as discussed
12/10/24: 2 20Amp circuits required at kitchen for small appliances, 90 degree fitting required at exterior condensate drain, properly secure mini split at platform, water heater pressure relief shall not terminate more then 6" above finish grade and less then 2X the pipe diameter, water heater enclosure not installed, hose bibs must be insane wrapped for UV Protection,
12/13/2024 COT - LCBU - Building Final  Partial Pass 12/13/24: OK FOR LEVEL 4 TCO.
12/17/2024 COT - LCBU - Building Final  Not Ready