Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Scheduled

Inspection History: ENGR Engineering Final

Permit Number - TC-COM-0423-01029

Inspection Description - ENGR Engineering Final

Inspection Status - Scheduled

Date Description Inspector Results Comments
ENGR Engineering Final Scheduled
12/10/2024 ENGR Engineering Final Partial Pass Contractor needs to finish putting in the gates. Some of the handrail needs to be installed and a couple of panels of sidewalk need to be RNR.
12/13/2024 ENGR Engineering Final Partial Pass Okay for TCO Level 4