Inspection History Details
Inspection Status: Failed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2026 | ENGR Engineering Final | Failed | Trash enclosure not built to TSM Standard. 8.01.9.0 Figure 3B for single enclosure. Detail 3 on page A0.1 is figure 3B. Enclosure is not built to this plan, Dumpster clearance is okay...Site Plan shows double enclosure with different orientation. Sidewalks keynote 16 shown on site plan not built on east and west sides. New ramps keynote 18, not built. Handicap parking Slope over 2%. Wheel stops do not comply with figure 2 on page A0.1 A revision may be a good option or build site per plans. |
|
| 07/26/2024 | ENGR Engineering Final | Not Ready | pedestrian circulation not in compliance. not built per approved plans. refuse enclosure not per standard. see pictures in inspection attachments. |