Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-COM-0326-00402

Parcel: 137010020


Addresses:

5001 S NOGALES HY

Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
07/29/2026 BULD - Electrical Clearance Partial Pass 7-29-26: verified trench depth at 26" for a 1 1/2" Schedule 40 electrical conduit for Musco Lighting at the South Soccer Field. Conduit is located on the north side of the field and conduit extends west to east. Okay to backfill approximately 330' of open trench using shading materials.
08/05/2026 BULD - Electrical Clearance Partial Pass Partial pass. South soccer field. From 2nd musco lighting pole south west corner. Approximately 70’ of X1 1 1/2” schedule 40 at 24” depth. Up to double box ran along all west end of soccer field to double box at south west corner. Approximately 235’. From double box ran north of soccer field to musco light pole approximately 70’. Olay to backfill all progress areas. Shading required. Ensure caution tape is in place after first lift of compaction. 8/5/2026