Inspection Status: Partial Pass
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 10/21/2026 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
10/21/26: Reinforcement/Footings/layout for Basketball courts has been approved and installed per approved plans. Ok to proceed with concrete placement. |
| 11/05/2026 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
11/5/26: verified trench depth/ reinforcement together with conduit and ground on 4 area light pole cages. 1 light pole cage located between Ramada 2 and the playground. Remaining 3 are located on east side of east soccer field. Okay for concrete placement. |