Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/09/2025 |
ENGR Engineering Final
|
|
Passed |
Previous inspection comment required a development package to replace brick pavers with concrete. Zoning Administrator has determined a development package is not required in this circumstance. |
| 06/27/2025 |
ENGR Engineering Final
|
|
Not Ready |
06/27/25, A Development permit will have to be done for the brick pavers in the front of the 2 entrance's. |