Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - LCPL - Gas Final 

Date Description Inspector Results Comments
03/13/2025 COT - LCPL - Gas Final  Re-inspection required 3/13/25: gauge must be a 15 pound gauge, the gauge must be in working condition, piping must be a minimum of 12" below grade to the top of the pipe,
03/14/2025 COT - LCPL - Gas Final  Passed