Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2026 | ENGR Engineering Final | Passed | Exterior of the building is complete and safe. | |
| 12/23/2025 | ENGR Engineering Final | Partial Pass | Okay for level 1 TCO for installation of shelving |