Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2024 | COT - LCPL - Rough Soil | Not Ready | 6/27/24: pre-con meeting | |
| 06/28/2024 | COT - LCPL - Rough Soil | Not Ready | ||
| 07/03/2024 | COT - LCPL - Rough Soil | Passed | 6/27/24: pre-con meeting Underground plumbing, not ready for inspection please place new plumbing under test and cap existing or demoed lines were required 7/3/24: plumbing underground under test and capped at existing lines ok to proceed with backfill. |