Permit: TC-COM-0324-00474

Parcel: 130144220


Addresses:

1502 S COLUMBUS BL

Inspection Status: Passed

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
02/04/2026 COT - LCBU - Excavation/Rebar/Zoning  Passed
06/18/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass North screen wall footing approximately 900 feet.. Ok to set CMU Block up to top-out at 6’ and schedule a masonry pre-grout.
09/30/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass All west end footing approved for new CMU wall. Verticals in place along with doubles at every 20' for control joints. Okay for concrete placement. 9/30/2025
10/28/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 10-28-25: approximately 700' of excavation & reinforcement verified per plans on south side footings. Okay for concrete placement at progress areas.
11/24/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass South side of property