Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | COT - HCBU - Framing | Partial Pass | 4/2/24: R-19 BATT-insulation per plans at theater exterior walls. Ok to proceed. | |
| 05/16/2024 | COT - HCBU - Framing | Not Ready | 4/2/24: R-19 BATT-insulation per plans at theater exterior walls. Ok to proceed. 5/16/24: not ready |
|
| 05/20/2024 | COT - HCBU - Framing | Not Ready | 4/2/24: R-19 BATT-insulation per plans at theater exterior walls. Ok to proceed. 5/16/24: not ready 5/20/24: not ready |
|
| 05/24/2024 | COT - HCBU - Framing | Passed |