Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCEL - Electrical Above Ceiling
Permit Number - TC-COM-0323-00830
Inspection Description - COT - HCEL - Electrical Above Ceiling
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/16/2024 | COT - HCEL - Electrical Above Ceiling | Not Ready | 5/16/24: not ready | |
05/20/2024 | COT - HCEL - Electrical Above Ceiling | Not Ready | 3/7/24: roof nailing inspection passed. Roof framing per plan ok to proceed. Ok to spray foam progress areas. 5/16/24: not ready 5/20/24: not ready |
|
05/23/2024 | COT - HCEL - Electrical Above Ceiling | Partial Pass | 3/7/24: roof nailing inspection passed. Roof framing per plan ok to proceed. Ok to spray foam progress areas. 5/16/24: not ready 5/20/24: not ready 5/23/24: building above ceiling at room 106, room 111 exit, rooms 119 and 118 south emergency exit. |
|
05/24/2024 | COT - HCEL - Electrical Above Ceiling | Re-inspection required | 3/7/24: roof nailing inspection passed. Roof framing per plan ok to proceed. Ok to spray foam progress areas. 5/16/24: not ready 5/20/24: not ready 5/23/24: building above ceiling at room 106, room 111 exit, rooms 119 and 118 south emergency exit. 5/24/24: all penetrations must be sealed going through vapor barrier and top plate. |
|
05/30/2024 | COT - HCEL - Electrical Above Ceiling | Passed |