Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Building Progress
Permit Number - TC-COM-0323-00766
Inspection Description - COT - HCBU - Building Progress
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/04/2024 | COT - HCBU - Building Progress | Partial Pass | 11/20/23: 4th lift at 16' reinforcement per plan ok to proceed. Firewall reinforcement per plan ok to proceed (@16' going up to 17'4"), 8 roof drains installed per plan ok to proceed. 1/4/24: 36" steel cold-formed steel @ 4' O.C being installed. Will verify proper installation at roof nailing. |
|
02/14/2024 | COT - HCBU - Building Progress | Partial Pass | 2/14/24: HVAC Mechanical equipment is installed on the roof, rough framing is complete in office area and staff restrooms, exhaust ductwork is installed in staff restrooms, vehicle exhaust ductwork is being installed in Bay Area. Electrical rough-in is complete in staff restrooms, water fountain location, water heater location, and office area. Okay to install drywall on both sides of walls throughout building. Hard lid ceilings will be installed and inspected after wall drywall is installed. | |
COT - HCBU - Building Progress | Passed | |||
11/20/2023 | COT - HCBU - Building Progress | Partial Pass | 11/20/23: 4th lift at 16' reinforcement per plan ok to proceed. Firewall reinforcement per plan ok to proceed (@16' going up to 17'4"), 8 roof drains installed per plan ok to proceed. |