Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Masonry Pregrout
Permit Number - TC-COM-0323-00766
Inspection Description - COT - HCBU - Masonry Pregrout
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/28/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | North, east and west stem wall. Rebar per plan. Okay for concrete placement. 9/28/2023 | |
11/13/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 11-13-23: East, west, and south CMU Block walls are 8' high with horizontal and vertical rebar reinforcement in place for bond beams above doors, and ready for 2nd grout lift. Okay to proceed with grout pour. | |
11/16/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | Third lift. | |
11/20/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | North, east and west stem wall. Rebar per plan. Okay for concrete placement. 9/28/2023 11-13-23: East, west, and south CMU Block walls are 8' high with horizontal and vertical rebar reinforcement in place for bond beams above doors, and ready for 2nd grout lift. Okay to proceed with grout pour. Third lift. 11/20/23: 4th lift @16’ at East, West and South CMU Block walls. Ok to proceed. |
|
11/22/2023 | COT - HCBU - Masonry Pregrout | Partial Pass | 4th lift. | |
11/27/2023 | COT - HCBU - Masonry Pregrout | Passed | 23’6 6th lift final lift. Rebar per plan. okay for top out all around. 11/27/2023 |