Inspection Status: Not Ready

Inspection History: COT - LCPL - Plumbing Final 

Date Description Inspector Results Comments
06/12/2026 COT - LCPL - Plumbing Final  Not Ready
07/01/2026 COT - LCPL - Plumbing Final  Canceled 7.1.26
Contractor just needs an above ceiling inspection for a water meter install. We can look at this when mech above ceiling is called in.