Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2026 | ENGR Engineering Final | Not Ready | Pedestrian circulation paths under 5% running slope do not require handrails.. Development Package ‘DP22-0012’ is not currently active, once this has been resolved, schedule a pre-construction inspection. Site work will fall under that permit. |