Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
04/01/2026 ENGR Engineering Final Not Ready Berms for slowing and redirecting Storm Water Flow with alternating armored spillways north of site are not done. L200 and L300 detail 8. Revegetation seed mix/hydro seed not in place where indicated per plan and should be protecting all disturbed dirt.