Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/01/2026 |
ENGR Engineering Final
|
|
Not Ready |
Berms for slowing and redirecting Storm Water Flow with alternating armored spillways north of site are not done. L200 and L300 detail 8. Revegetation seed mix/hydro seed not in place where indicated per plan and should be protecting all disturbed dirt. |