Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | COT - HCBU - Framing | Re-inspection required | 7/3/25: revision required for changes made to framing (2x6 joist spaced at 24" o.c . Plans call for 16" o.c. More then the listed framing members were replaced), electrical nit ready at time of inspection ( panel cannot be located in bathroom), mechanical not complete (exhaust fans missing, no access to west bathroom). Roof sheathing has been installed and covered prior to inspection. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. | |
| 12/11/2025 | COT - HCBU - Framing | Passed | 12/11/25 Passed by Jim B. In July under Building progress. |