Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - HCBU - Building Final 

Date Description Inspector Results Comments
01/21/2026 COT - HCBU - Building Final  Re-inspection required 1-21-26: missing suite address-must be 4" tall, restroom not ADA compliant-flush control must be on accessible side, lower mirror to 40" to reflective surface, lower lavatory to 34", lower towel dispenser to 48" o.c., 5 pounds of door pressure are required for accessible restrooms, install restroom sign with braille. Stopped inspection-provide set of approved plans to determine scope of work.
01/26/2026 COT - HCBU - Building Final  Re-inspection required 1-26-26: building restroom-lower paper dispenser to 4' 6" to the top, soap dispenser to 54" to top, missing toilet paper dispenser, lower grab bar to 36" aff to the top, install mirror to 40" to the reflective surface, lavatory 34 "aff, missing knee guards. Public restroom-flush control valve on water closet must be on accessible side, lower mirror 40 " aff to the reflective surface, lower lavatory to 34 "aff, install knee guards at lavatory, adjust door to 5 pounds of pressure. Electrical-add :knockouts" at subpanel, install a receptacle bubble cover together with a weather resistant gfci at rooftop, label disconnect on rooftop, properly label all breakers with a permanent black marker or provide updated panel schedule & sleeve, any receptacle within 6' of water requires a gfci. Plumbing-add a 90 degree elbow at condensation line at southwest side of building, paint all pvc at rooftop, wrap copper water shut off at southwest side of site with R3 insulation. Mechanical-lower a/c thermostat to 48" aff.
02/03/2026 COT - HCBU - Building Final  Canceled 2-3-26: canceled by contractor.
02/13/2026 COT - HCBU - Building Final  Passed 2/12/26 corrections made