Inspection History Details
Inspection Status: Passed
Inspection History: COT - LCBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2025 | COT - LCBU - Preslab | Passed | 6-24-25: preslab, excavation/reinforcement /setbacks verified per plans. Okay to pour concrete-foundation D. |