Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2026 | ENGR Engineering Final | Partial Pass | Okay for level 4 TCO for west half (Nathan’s) only. | |
| 03/10/2026 | ENGR Engineering Final | Not Ready | 3/10/26. 3 ramps total -2 south 1 north in east seating area South Ramp (to the west)- 2 of the panels are over 8.33%. Handrail at bottom does not extend 12" past the end of the ramp on both sides. South Ramp (to the east) Landings are incorrect. Must be less than 2% both ways North ramp landings are also incorrect. Handicap Parking shown in plan are not in place at east parking area... Reschedule inspection when ready and all ramps, landings handrail and handicap parking comply. |
|
| 04/17/2026 | ENGR Engineering Final | Partial Pass | Slopes of ramps and landings comply but 12"x 12" handrail extensions need to be in place on handrail. These are extending 12'" past end of ramp in direction of travel then return back to vertical 12" down from top of rail. Schedule inspection when ready. |