Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Underground
Permit Number - TC-COM-0224-00349
Inspection Description - COT - LCEL - Electrical Underground
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2025 | COT - LCEL - Electrical Underground | Partial Pass | ||
| 08/20/2025 | COT - LCEL - Electrical Underground | Partial Pass | ||
| 09/26/2025 | COT - LCEL - Electrical Underground | Partial Pass | 3” for well pump from pump control panel to well head. Air compressor and chlorine building (co2) x2 3/4” and 1” from electrical rack to chlorine building. X3 3/4” and X3 1” from electrical rack to level sensor and pressure pedestal. All schedule 40 at 32” depth. Okay to backfill all progress areas. Shading required. 9/26/2025 |