Inspection Status: Partial Pass
Inspection History: COT - HCBU - Building Progress
Permit Number - TC-COM-0224-00334
Inspection Description - COT - HCBU - Building Progress
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | COT - HCBU - Building Progress | Partial Pass | 5/5/25: spark test at sewer manhole 1 approved, vacuum test at manhole 1 approved. | |
| 05/21/2025 | COT - HCBU - Building Progress | Re-inspection required | 5-21-25, anchor bolt spacing was previously inspected and a reinspection was required prior to continuing with construction. Therefore, sections of the drywall along the bottom end will have to be removed to verify anchor bolt placements. If you have detailed pictures/video that can demonstrate proper anchor bolt spacing then provide that information to myself or Building Inspector Supervisor, Gustavo Armenta for review. Add nails/screws to interior plywood sheathing as required per plans and reschedule an inspection. Areas that have been inspected and approved and where you already have drywall installed; require proper spacing of screws. Add screws/nails to drywall at joints/seams where closer than 3/8" and assure that screws do not over penetrate more than 1/16". Call for an inspection prior to tape and texture. | |
| 08/08/2025 | COT - HCBU - Building Progress | Passed | 8-8-25: approved |