Inspection Status: Re-inspection required

Inspection History: COT - LCBU - Building Final 

Permit Number - TC-COM-0224-00231

Inspection Description - COT - LCBU - Building Final 

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
08/12/2024 COT - LCBU - Building Final  Re-inspection required Grab bars need to be 36" to top of bar. Electrical panel needs to be printed labels. Pending both T&B and chlorination reports prior to final inspection. 8/12/2024
08/13/2024 COT - LCBU - Building Final  Re-inspection required Grab bars need to be 36" to top of bar. Electrical panel needs to be printed labels. Pending both T&B and chlorination reports prior to final inspection. 8/12/2024
8/13/24: pending Air balance report and water sterilization report. Pending fire final. Pending RFI on new store front opening.
08/15/2024 COT - LCBU - Building Final  Passed Grab bars need to be 36" to top of bar. Electrical panel needs to be printed labels. Pending both T&B and chlorination reports prior to final inspection. 8/12/2024
8/13/24: pending Air balance report and water sterilization report. Pending fire final. Pending RFI on new store front opening.
8/15/24: ok for CofO