Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/29/2023 | COT - LCBU - Building Final | Re-inspection required | 3-29-23: 1-Complete sink installation per Code, or remove non-compliant plumbing for it. 2-Install under sink protection n bathroom. 3-Floor sh valve is inaccessible. | |
| 04/05/2023 | COT - LCBU - Building Final | Re-inspection required | 4-5-23: No access for inspection. | |
| 04/06/2023 | COT - LCBU - Building Final | Not Ready | 3-29-23: 1-Complete sink installation per Code, or remove non-compliant plumbing for it. 2-Install under sink protection n bathroom. 3-Flush valve is inaccessible. 4-5-23: No access for inspection. inspection. 4-6-23: provide scope of work and copy of approved plans |
|
| 04/11/2023 | COT - LCBU - Building Final | Passed |