Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - HCPL - Rough Soil | Passed | |||
| 08/10/2023 | COT - HCPL - Rough Soil | Partial Pass | 8/10/23: rough soil and sewer lines to grease trap approved to cover. | |
| 08/16/2023 | COT - HCPL - Rough Soil | Not Ready | 8/10/23: rough soil and sewer lines to grease trap approved to cover. 8/16/23: this is the second time contractor has scheduled an incorrect type of inspection request. He was informed on 8/10/23: to correct this before next inspection. It is the contractors responsibility to schedule the correct inspection. |