Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2023 | ENGR Engineering Final | Not Ready | no site work has been completed at this time. Accessible walkways installed at southern and western portion of building are out of compliance. Trough drain appears to have been added without plan, revisions, or inspection. Contractor shall schedule inspections from the development package permit. Telephone message left for julie at 975-8462 |
|
| 10/03/2023 | ENGR Engineering Final | Partial Pass | Engineering has no issues to prevent a temporary certificate of occupancy. | |
| 11/04/2025 | ENGR Engineering Final | Passed |