Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2026 | COT - HCEL - Electrical Underground | Partial Pass | 2” conduit near block wall running towards antenna serving coax cable. 3/4” in the middle serving receptacle running towards service panel (house panel) with the remaining conduits. New SCP (site control panel) location branching off feeding pump panel. 2” feeding well pump. All conduit in building okay to backfill. Shading required. 3/20/2026 1/0 ground cable in place along with ground rods. Pending tie into equipment. 3/20/2026 |
|
| 06/26/2026 | COT - HCEL - Electrical Underground | Passed | 6.26.26 NW run for transformer secondary |