Permit: TC-COM-0126-00106

Parcel: 120052760


Addresses:

4654 S 16th AV

Inspection Status: Partial Pass

Inspection History: COT - LCBU - Building Final 

Date Description Inspector Results Comments
05/07/2026 COT - LCBU - Building Final  Partial Pass 5-7-26: approximately 75' of excavation /reinforcement/preslab at north wall CMU footing together with excavation/reinforcement for Control building verified per plans & keynotes. Okay for concrete placement at progress areas.
05/11/2026 COT - LCBU - Building Final  Partial Pass 5-11-26: reinforcement/excavation on approximately 200' of screen wall footing at north, east, and south approved. Okay for concrete placement.
05/13/2026 COT - LCBU - Building Final  Partial Pass 5-13-26: welded wire reinforcement verified at Control Building slab on grade-okay for concrete placement.
05/14/2026 COT - LCBU - Building Final  Not Ready 5-14-26: not ready. Please reschedule at your convenience.
05/15/2026 COT - LCBU - Building Final  Partial Pass 5-15-26: reinforcement at screen wall & at control building verified per plans. Okay to grout 1st lift at 4'.
05/22/2026 COT - LCBU - Building Final  Partial Pass 5-22-26:reinforcement at top out for screen wall & control building approved. Okay to grout.
06/02/2026 COT - LCBU - Building Final  Partial Pass 6-2-26: pre slab/reinforcement at roof of control building approved. Okay for concrete placement.