Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/11/2026 | COT - LCEL - Electrical Intermediate | Partial Pass | 6/11/2026 elevator P8 approved. Verified disconnects recepts, and lighting. All labeled and properly fused. Okay to proceed with progress areas. | |
| 06/11/2026 | COT - LCEL - Electrical Intermediate | Partial Pass | 6th floor bathrooms and bedroom areas approved. 6450- 6473. pending 6451,6461,6471. 7th floor room 7472,74717459 Verified panels JP1LP, JP1PA, JP1 and those that tie into the new Lutron panels that control lighting throughout. 6/11/2026 |
|
| 08/03/2026 | COT - LCEL - Electrical Intermediate | Passed | 8-3-26: electrical intermediates/power plan and lights at level P2-Electrical rm for Elev. S2 approved. |