Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: COT - HCME - Mechanical Final 

Date Description Inspector Results Comments
05/19/2026 COT - HCME - Mechanical Final  Partial Pass 5-19-26: 4th floor mechanical final at room's 432, 431, 434, 433, 429, 430, 428, 427, 426, 425, 423, 425, 421, 422, 419, 420, 418, 417, 415, 426, 413, 411,-kitchen exhaust not working, 412, 409, 410, 408, 407, 406-kitchen exhaust not working, 405, 403, 404, 402, 401.
05/28/2026 COT - HCME - Mechanical Final  Partial Pass 5/28/2026 partial pass. 3rd floor 301-334 approved.
06/01/2026 COT - HCME - Mechanical Final  Partial Pass 6-1-26: mechanical final @ 2nd floor, rooms 215, 216, 213, 211, 212, 209, 210, 208, 207, 205-missing thermostat and mini split cover, 203, 201, 202, 204, 206, 208. missing subpanel schedules- we need to verify Minnie split breakers.
Note: we will inspect the exterior HVAC units at a later date. See IECC, Section's R403.4 & 403.4.1 for protection of piping insulation requirements.
06/15/2026 COT - HCME - Mechanical Final  Partial Pass 6-15-26: mechanical final at 1st floor rooms approved. Properly secure mini splits to their base and provide a 3" clearance from grade. Seal behind HVAC disconnects and install permanent labeling. Disconnects must clearly identify their purpose. For example, A/C #1 and must identify the circuit-see NEC 110.22. Additionally, see IECC, Section's R403.4 & 403.4.1 for protection of piping insulation requirements.
06/24/2026 COT - HCME - Mechanical Final  Partial Pass 6.24.26
1.Corrected Rm 205.
2. FCU 5 and 6 for the attic do not have access per 2018 IMC 306.3:
- Need an unobstructed passageway, large enough to allow for removal of the largest appliance.
- Passageway shall not be less than 30 inches high and 22 inches wide and not more than 20 feet in length measured along the center line of the passageway from the opening to the appliance. Passageway, shall have continuous solid flooring, not less than 24 inches wide.
- A level working space not less than 30 inches deep and 30 inches wide shall be present at the front or service side of the appliance.