Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2026 | BULD - Electrical Clearance | Not Ready | Each meter must have a current address; individual disconnects must be in place and operational. | |
| 01/27/2026 | BULD - Electrical Clearance | Passed | 01/27/2026 Clearance TEP ECO. Verified added metal Unit 1-6 labels to each panel along with individual breakers. |
|
| 02/03/2026 | BULD - Electrical Clearance | Not Ready | 2/3/26: Not ready, wiring at meter pack incomplete, units 1-6 must be terminated at meter packs and inspections shall take place to verify wire size/type/grounding. Supports on conduit will also be inspected. Ensure ground rods are flush with earth and are properly secured. | |
| 02/09/2026 | BULD - Electrical Clearance | Not Ready | Cancel my contractor | |
| 02/10/2026 | BULD - Electrical Clearance | Passed | 2/10/26: TEP ECO CLEARANCE FOR 1138 N RICHEY BL UNIT 1, UNIT 2, UNIT3,UNIT4,UNIT5,UNIT6 | |
| 02/10/2026 | BULD - Electrical Clearance | Passed | ECO ECO |