Inspection History Details
Inspection Status: Passed
Inspection History: COT - LCME - Mechanical FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2025 | COT - LCME - Mechanical FinalĀ | Passed | 7.30.25 PVC is painted and terminates correctly off of roof. Fuses at disconnects verified. UL listed equipment verified. Air admittance verified at interior units. Proper slope on lines verified. Sediment traps verified. Shut off valves verified. Mechanical equipment verified and observed to be in working condition. |