Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCME - Mechanical Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2024 | COT - LCME - Mechanical Intermediate | Not Ready | Install H2.5 on studs per plan 7/17/24: not ready |
|
| 07/18/2024 | COT - LCME - Mechanical Intermediate | Re-inspection required | Install H2.5 on studs per plan 7/17/24: not ready 7/18/24: knockouts at sub panels must be sealed, seal all penetrations going through floor decking to floor below, nail plates missing throughout at dryer vent, sheathing damaged at feeders in multiple units, properly secure feeders at sub panels, nail plates missing throughout at electrical circuits/ feeders, remove all insulation at ceiling, block registers at 3 sides. Third floor flex duct above building thermal envelope must be R-8. |
|
| 07/22/2024 | COT - LCME - Mechanical Intermediate | Passed |