Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/01/2024 |
ENGR Engineering Final
|
|
Partial Pass |
The site has been checked and the following determined: 1) Th foundations are accepted to be poured in all locations where there are no conflicts within the footers. Photograph all foundation holes prior to filling with concrete to verify that the foundations are not compromised. 2) The Engineer of Record needs to rectify the existing line in 3 or more of the foundations. |
| 10/24/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor is good to pour the pole foundations for the fence |
| 10/31/2024 |
ENGR Engineering Final
|
|
Passed |
|