Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2025 | ENGR Engineering Final | Not Ready | No more then a 4" space is required between pickets on second floor balcony and units need to be addressed | |
| 08/05/2025 | ENGR Engineering Final | Passed | passed |