Inspection History Details
Inspection Status: Passed
Inspection History: COT - LCEL - Electrical FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2023 | COT - LCEL - Electrical FinalĀ | Passed | Approved, RECN Clearance to TEP is required for the reconnection (meter #159518129) |