Inspection History Details
Inspection Status: Closed
Inspection History: FOLLOW UP CODE VIOLATION
Case Number - T99VL02656
Inspection Description - FOLLOW UP CODE VIOLATION
Inspection Status - Closed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/06/2003 | FOLLOW UP CODE VIOLATION | Closed | MET WITH CECI IN OFFICE. DECISION MADE TO CLOSE CASE DUE TO THE FACT THE PROPERTY IS OWNED BY THE PASCUA YAQUI TRIBE OF AZ. THEREFORE THIS PROPERTY IS CONSIDERED SOVEREIGN PROPERTY. NO JURISDICTION. CLOSE CASE. | |
11/01/2002 | FOLLOW UP CODE VIOLATION | Correction Required | MET WITH ROB AND CECI ON EXTENSION. OK TO EXTEND 60-DAYS.PLANS ARE STILL UNDER REVIEW AT DSD. | |
09/11/2002 | FOLLOW UP CODE VIOLATION | Correction Required | PLANS ARE BACK AT DSD PLAN CHECK AT THIS TIME. F/U 30-DAYS. | |
07/30/2002 | FOLLOW UP CODE VIOLATION | Correction Required | PLANS HAVE BEEN HANDED BACK TO ARCHITECT FOR CORRECTIONS AND ARE BEING CORRECTED. WILL CHECK IN 30 DAYS. | |
01/17/2002 | FOLLOW UP CODE VIOLATION | Violation | VISITED SITE AND WORK STILL HALTED. ARCHITECT CALLED WHEN ON SITE AND HAD TO DO MORE DRAWINGS AND WILL BE RE-SUBMITTING BY NEXT WEEK. WILL CHECK IN 45 DAYS. TALK TO LEON VICKERS. | |
12/18/2001 | FOLLOW UP CODE VIOLATION | Violation | PLANS STILL OUT FOR CORRECTIONS. F/U 1/17/02. | |
11/19/2001 | FOLLOW UP CODE VIOLATION | Violation | PERMIT # T01CM05341 HAS BEEN APPLIED FOR ON 10/25/01 AND IS BEING REVIEWED. HAVE TALKED TO ARCHITECT AND WILL KEEP IN CONTACT. F/U 12/19/01. | |
10/12/2001 | FOLLOW UP CODE VIOLATION | Violation | F/U 11/13/01. | |
08/07/2001 | FOLLOW UP CODE VIOLATION | Violation | TALK TO ARCHITECT BY PHONE AND WAITING FOR STRUCTURAL CALC'S AND DESIGNS FOR SUBMITTALS. F/U IN 45 DAYS ON 10-08-01 | |
06/06/2001 | FOLLOW UP CODE VIOLATION | Violation | HAD SEVERAL CALLS WITH LEO ABOUT CITATION, ARCHITECT CALLED AND GOT APPROVAL ON TEST HOLES FOR POST AND WILL BE SUBMITTING ON MONDAY. WILL BE CHECKING ON 07-06-01 | |
04/12/2001 | FOLLOW UP CODE VIOLATION | Violation | DRAWINGS ALMOST DONE. F/U ON 05-14-01. | |
02/22/2001 | FOLLOW UP CODE VIOLATION | Violation | STILL WORKING ON DRAWINGS. HAS NOT APPLIED YET.F/U SCHEDULE 4-9-01. | |
12/28/2000 | FOLLOW UP CODE VIOLATION | Violation | TALKED TO ENGINEER BY PHONE & HE HAS SENT ME COPY'S OF TEMPORY PERMIT & IT WAS FOR TRAILERS BEING USED AS OFFICE NOT FOR PORTION BEING USED AS CHURCH. | |
11/28/2000 | FOLLOW UP CODE VIOLATION | Violation | TALK TO JARVEY THOMSON BY PHONE & HAVE MET WITH STRUCTURE ENGINEER A COUPLE OF DAYS AGO & WILL BE SUBMITTING SOON FOR APPROVAL.F/U SCHEDULED FOR 12-28-00. | |
10/03/2000 | FOLLOW UP CODE VIOLATION | Correction Required | HAS ENGINEERS AND ARCH WORKING ON DWGS. HAS MEETINGS WEEKLY W/COUNCIL OF TRIBE. DWGS ARE ALMOST DONE. FU 45 DAY ON | |
08/18/2000 | FOLLOW UP CODE VIOLATION | Violation | 45 DAY F/U SCHEDULED FOR 10/3/00. | |
08/09/2000 | FOLLOW UP CODE VIOLATION | Violation | 15 DAY FOLLOW UP SCHEDULED 8/18/00. | |
05/31/2000 | FOLLOW UP CODE VIOLATION | Violation | 45-DAY F/U |