Case: T99VL01382

Parcel: 106030990

Inspection Status: Correction Required

Inspection History: FOLLOW UP CODE VIOLATION

Date Description Inspector Results Comments
04/03/2000 FOLLOW UP CODE VIOLATION Correction Required ADDTL COMMS - BUILDINGS BROUGHT INTO COMPLIANCE. CASE TO BE CLOSED.
04/03/2000 FOLLOW UP CODE VIOLATION Compliance COMPLIANCE
02/28/2000 FOLLOW UP CODE VIOLATION Correction Required ADDTL COMMS - ALL REAR UNITS VACANT. WORK IS BEING DONE INSIDE AND OUTSIDE OF ALL UNITS. FOLLOW UP END OF MARCH BEFORE COURT DATE.
02/28/2000 FOLLOW UP CODE VIOLATION Violation VIOLATION
10/11/1999 FOLLOW UP CODE VIOLATION Correction Required ADDTL COMMS - DUE TO SUBSTANDARD CONSTRUCTION PRACTICES A STOP WORK ORDER HAS BEEN POSTED ON UNIT 204.
10/11/1999 FOLLOW UP CODE VIOLATION Violation STOP WORK ORDER POSTED
10/08/1999 FOLLOW UP CODE VIOLATION Correction Required ADDTL COMMS - PHOTOS TAKEN. MANY OF THE REPAIRS BEING MADE ARE NOT TO MINIMUM CODE STANDARDS. CITATION TO BE ISSUED.
10/08/1999 FOLLOW UP CODE VIOLATION Violation VIOLATION
05/14/1999 FOLLOW UP CODE VIOLATION Correction Required ADDTL COMMS - ROOF IS STABLE ON REAR UNIT. THERE ARE EXTERIOR PROBLEMS WITH ALL UNITS. HNO TO BE SENT TO OWNER. 10/25/99 BUILDING WITH STOP ORDER ON THE REBUILDING OF THE NORTH WALL IS STILL IN THE SAME CONDITION. NO CHANGE.
05/14/1999 FOLLOW UP CODE VIOLATION Violation VIOLATION