Inspection Status: Correction Required
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 10/12/1999 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
ADDTL COMMS - THE PORCH AT THE REAR OF THE FRONT BUILDING HAS BEEN REMOVED. THE STOCKADE FENCING HAS BEEN REPAIRED. THE ROOF RAFTER SUPPORT GIRDER, AND ITS SUPPORT POST, HAVE BEEN REPLACED. CLOSE THIS CASE |
| 10/12/1999 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
COMPLIANCE |
| 09/21/1999 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
ADDTL COMMS - NO REPAIRS MADE. POSTED FRONT DOOR WITH HNO. CONTACT ALSO MADE WITH OWNER BY PHONE. OWNER CLAIMS WORK WILL BE DONE WITHIN 1 WEEK. FOLLOW UP IN 2 WEEKS. |
| 09/21/1999 |
FOLLOW UP CODE VIOLATION |
|
Violation |
VIOLATION |