Inspection Status: Correction Required
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/14/2000 |
PLUMBING - FINAL |
|
Correction Required |
ADDTL COMMS - REMOVE 3/4 UNION TO RANGE AND CONNECT SOLID |
| 01/06/2000 |
PLUMBING - FINAL |
|
Correction Required |
ADDTL COMMS - 1. NEED IRON PIPE THUR HW HEATER ENCLOSURE AND CONNECT FLEX INSIDE. 2. USE APPROVE HW HEATER VENT CAP 3. 10 LBS AIR TEST REQUIRE (SHOW ZERO). |
| 01/06/2000 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0000* |
| 12/30/1999 |
PLUMBING - FINAL |
|
Correction Required |
ADDTL COMMS - 1. WATER HTR MUST HAVE ENCLOSURE TO PROTECT IT FROM ELEMENTS. 2. WATER HTR P&T DRAIN MUST BE STUB DOWN 6 ABOVE SLAB 3. WATER HTR GAS SHUT OFF VALVE MUST BE AGA APPROVED 4. UNDERGROUND GAS LINE FITTINGS MUST HAVE PRIMER & TAPE 5. GAS LINE MUST BE SECURED ON WALL WITH APPROVED STRAPS EVERY 8 6. GAS RANGE MUST HAVE AGA APPROVED SHUT OFF VALVE @ FLEX 7. MUST PROVIDE AIR PRESSURE TEST ON GAS LINE 10 LBS MIN. 8. YOU CAN NOT CONNECT TWO GAS FLEXES TOGETHER REMOVE ONE. |
| 12/30/1999 |
PLUMBING - FINAL |
|
Denied |