Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 01/14/2000 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - REMOVE 3/4 UNION TO RANGE AND CONNECT SOLID. |
| 01/14/2000 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0000* |
| 01/04/2000 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - 1. H. WATER HEATER ENCLOSURE 2. H.W. HEATER VENT NOT CONNECTED NOT SECURE. 3. RUN IRON PIPE INSIDE ENCLOSURE. 4. 10 LBS TEST REQUIRES AIR TEST. 5. CUT BOTTOM THREADS ON P&T DRAIN. |
| 01/04/2000 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0000* |
| 12/30/1999 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - 1. WATER HTR MUST HAVE ENCLOSURE TO PROTECT IT FROM ELEMENTS 2. WATER FTTR P&T DRAIN MUST BE STUB DOWN 6 ABOVE SLAB 3. WATER HTR GAS SHUT OFF VALVE MUST BE AGA APPROVED 4. UNDERGROUND GAS LINE FITTTINGS MUST HAVE PRIMER & TAPE 5. GAS LINE MUST BE SECURED ON WALL WITH APPROVED STRAPS EVERY 8. 6. GAS RANGE MUST HAVE AGA APPROVED SHUT OFF VALVE @ FLEX 7. MUST PROVIDE AIR PRESSURE TEST ON GAS LINE 10 LBS MIN. 8. YOU CAN NOT CONNECT TWO GAS FLEXES TOGETHER REMOVE ONE. |
| 12/30/1999 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0000* |