Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Correction Required
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 09/16/1999 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - OK GAS YARD PIPING AND REAR UNIT NEED PERMIT ON H.W. HEATER AND WATER LINE |
| 09/15/1999 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - 1. 10 LBS TEST REQUIRE 2. NEED PERMIT ON RELOCATE OF H.W. HEATER INSPECTION 3. REMOVE UNION AT MAIN HOUSE OF BLDG ENTRY LOWER UNION OR USE RIGHT AND LEFT HAND NIPPO @ COUP. 4. REVERSE UNION @ REAR UNIT 5. CHECK BTU RATING ON GAS PIPING FOR PIPE SIZE 3/4 INSTALL |
| 09/15/1999 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0000* |