Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 10/01/1999 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - NOTE NEED PERMIT ON NEW HOT WATER HEATER CORRECT AND CALL BACK |
| 10/01/1999 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection 0000* |
| 09/07/1999 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0000* |
| 09/01/1999 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - 1. NEED TO REMOVE OVERHEAD 1/2 UNION AND USE RIGHT AND LEFT HAND NIPPO 2. NO GAS APPLIANCES ALLOW IN BEDRM REMOVE GAS PIPING AND HEATER AND USE ELECTRIC HEATER 3. HOT WATER HEATER REJECTED NO VENT AND HEATER IN BAD CONDITION IF REPLACE OBTAIN PERMIT ON HEATER CALL BACK TRINI 09/01/99 NEED LIC PLBG COMM CONTR RENTAL UNITS |
| 09/01/1999 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
DENIED |