Inspection History Details
Inspection Status: Correction Required
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/1999 | PLUMBING - FINAL | Correction Required | ADDTL COMMS - 1. PRESSURE 55+ P.S.I. 2.(3) THREE ANTI-SIPHON DEVICES INSTALLED. 3. ELECT GND COND INTO EARTH UNDER THE PANEL. |