Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/04/1999 |
PLUMBING - FINAL |
|
Correction Required |
ADDTL COMMS - 1. (4) FOUR ANTI-SIPHON DEVICES OK. 2. ELECT SVC. GND CONDUCTOR STARTS IN UPPER BREAKER PANEL, GOES INTO THE LOWER BREAKER PANEL AND ATTACHES TO THE GND. BUSS, THEN ATTACHES TO AN E.M.T GROUNDING NUT ON THE E.M.T CONNECTOR. NO WATER BOND OR GROUND RODS. |